SkillTrust

← All skills

proj-work-breakdown-structure

100 / 100 · Low risk

Fine to try.

By polar-bear-org/claude-skills (GitHub) · design · 54 stars · scanned at commit 95f0180

Breaks the project into a deliverable tree down to work packages, with a 100% rule check, optional WBS dictionary rows, a proposed owner per package and a gaps list of forgotten work. Use for "run proj-work-breakdown-structure", "build a WBS", "break down this project", "work breakdown structure", "what does done contain", "decompose the deliverables", "list the work packages", "what are we forgetting", part of the AI for Project Management Pack by 90n.

Works with any agent that supports SKILL.md skills.

What this skill can do

We found nothing in the files we read that matches our rules. That does not prove the skill is safe: see the limits of static scanning.

Install

Paste this into your terminal. It downloads exactly the version we scanned, not whatever is newest.

if [ -e ~/.agents/skills/'proj-work-breakdown-structure' ] || [ -L ~/.agents/skills/'proj-work-breakdown-structure' ]; then echo 'A skill folder named proj-work-breakdown-structure already exists — not replacing it' >&2; false; else d=$(mktemp -d) && git clone --quiet --filter=blob:none --no-checkout 'https://github.com/polar-bear-org/claude-skills' "$d" && git -C "$d" checkout --quiet '95f01806ca43f6ee788d0579743e35853b695930' -- 'packs/ai-for-project-management-pack/skills/proj-work-breakdown-structure' && mkdir -p ~/.agents/skills && cp -R "$d"/'packs/ai-for-project-management-pack/skills/proj-work-breakdown-structure' ~/.agents/skills/'proj-work-breakdown-structure' && rm -rf "$d"; fi

Codex reads ~/.agents/skills directly. For Claude Code, Cursor, Copilot, Gemini CLI, Antigravity or OpenCode, also link it. For Claude Code: ln -s ~/.agents/skills/'proj-work-breakdown-structure' ~/.claude/skills/'proj-work-breakdown-structure' (other agents: ~/.cursor/skills, ~/.copilot/skills, ~/.gemini/skills, ~/.gemini/config/skills, ~/.config/opencode/skills). Or install through the finder skill, which does both.

Badge for your README

The badge for polar-bear-org/claude-skills shows the score of its lowest-scoring skill.

SkillTrust badge for polar-bear-org/claude-skills

[![SkillTrust](https://zalavijaysinh.github.io/skilltrust/badges/polar-bear-org/claude-skills.svg)](https://zalavijaysinh.github.io/skilltrust/repos/polar-bear-org/claude-skills/)

Score history

DateVersionScore
2026-11-0795f0180100